Amberg Technologies – Vermessung – Bahntechnik – Amberg Rail – Gleisvermessung – Gleisinspektion – Gleisdokumentation – Gleisgeometrie EN 13848 – Railway Track Survey – Railway Track As-Built – Railway Track Measurement – Track Measurement Trolley – Railway Track Alignment – Track Defects – Track Documentation – Track Cant Measurement – Track Gauge Measurement – Railway Tamping Measurement – Structural Gauging – Inertial Measurement Unit -Präzisionsmessung

Amberg Tamping

 
 

The perfect track!

  • Identify track position errors as a basis for construction and maintenance of ballast track
  • Comprehensive design data definition possibilities (absolute/relative alignment) including various interfaces for import and export
  • Interactive correction-data preparation for all current tamping machines (e.g. Plasser&Theurer, Matisa, Harsco)
  • Comprehensive reporting of track alignment and control point data
  • Integrated control point surveying as a stand-alone option

Which tamping application fits best for your job?

Feature / FunctionGRP 1000GRP 3000IMS 1000IMS 3000
Measuring performance (m/h)up to 1200up to 1200up to 4000up to 4000
Measuring System GRP FX II1111
Measurement of CPnoyesyesyes
Measuring device for CP--Profiler 120Total StationProfiler 120
Measurement accuracy of CP (mm)--313
Results in real-timeyesyesyes*yes*
Geodetic skill of operator requiredyesyesnono

* On Track IMS Measurement Preview

We are pleased to carry out your project

In collaboration with our technology associates and in-house specialists, we provide state-of-the-art solutions and instruments tailored to your needs.

Contact us

Downloads

Frequently Asked Questions

Amberg Rail Tamping is the Amberg Rail module for tamping measurement, processing and analysis of data from the GRP System FX. Tamping Basic post-processes track data from GRP 1000, GRP 3000, IMS 1000, and IMS 3000 with some reports. Tamping Plus adds tamping ramps per tamping run, correction file exports for tamping machines and final acceptance reporting.

A tamping ramp is an intermediate design position of the track, defined as an offset to the final design, that the track should reach after one tamping run. Ramps are needed because a tamping machine cannot move a badly misaligned track to its final position in one step. Exported correction values are calculated between the as-built position and the ramp.

In Amberg Rail Tamping, a new construction project normally consists of several tamping runs, up to seven, each bringing the track closer to its final position. Because accuracy requirements rise with each run, early runs can be measured with GNSS in kinematic mode and the last runs with a total station in stop-and-go mode, followed by a final acceptance measurement.

Amberg Rail Tamping offers two job types for tamping surveys: Tamping Absolute 3D, the standard measurement method positioned by total station or GNSS, and Tamping Chord Method used with IMS 1000 or IMS 3000. Useful project data such as design data sets, control points and point codes should be prepared before measuring.

Amberg Rail Tamping supports the GRP 1000, GRP 3000, IMS 1000 and IMS 3000 for Tamping jobs. GRP trolleys are positioned with a total station or a GNSS receiver. When the GRP 3000 or IMS 3000 is selected, the Profiler FX is automatically set as the profile measuring device, so profiles can be measured in the same job.

In Amberg Rail Tamping, the new application wizard lets you enter tamping run parameters: lift minimum and maximum, displace maximum, a final elevation added to all vertical corrections, and horizontal and elevation ramp slope values. These limits usually come from the machine parameters or railway regulations and are used to check the planned tamping run against the measurement and ramp.

In the Amberg Rail Tamping track view, you can use the Insert ramp tool to choose a ramp type and click ramp points into the graphic, or add ramp vertices by clicking in the horizontal or vertical deviation column. Vertex values are edited in the ramp table. Ramp, tamping limit and deviation limit layers are switchable layers.

Amberg Rail Tamping exports correction files for several tamping machine formats, including Plasser & Theurer (SmartALC, WinALC, ALC/DosALC, CGV5 and AGGS), Matisa, Framafer, Swietelsky and Harsco. The files are transferred to the machine for automatic track adjustment.

Start/End Tamping lets you mark horizontal or vertical ramp vertices in Amberg Rail Tamping as the start or end of tamping. Plasser WinALC and Plasser ALC/DosALC exports are then reduced to those ranges, corrections outside them can be set to zero, and several ranges can be exported separately. Other machine exports ignore these definitions.

After the final acceptance measurement, Amberg Rail Tamping reports deviations in position, height, gauge, superelevation, versines, twist and control point offsets in graphic or numeric form. Available outputs include graphic and text deviation reports, a twist report, a track quality index report, machine driver and control point reports, and LandXML, ASCII and DXF exports.