Highly efficient system for as-built surveying of existing railway lines including powerful interfacing for selective data transfer to other applications and subsequent analyses.
We are pleased to carry out your project
In collaboration with our technology associates and in-house specialists, we provide state-of-the-art solutions and instruments tailored to your needs.
Amberg Rail Survey is the Amberg Rail module for as-built surveys of existing railway lines. It post-processes track data measured with the GRP System FX and analyses the as-built parameters of the track. The resulting data can be used to re-design the alignment, for quality assurance of existing lines, or as pure as-built documentation.
Amberg Rail Survey offers three job types: Survey track absolute, Relative survey and Control Point Survey 2D. Absolute and relative surveys can be measured with the GRP 1000, GRP 3000, IMS 1000 or IMS 3000, while Control Point Survey 2D requires the GRP 3000. Design data sets, control points and point codes can be prepared before measuring.
Yes. In a Survey track absolute job, Amberg Rail Survey positions the GRP 1000 or GRP 3000 trolley with a total station or a GPS/GNSS receiver. The operator is warned if the trolley is too far from the total station or the GNSS coordinate quality exceeds the set limit. Inertial IMS 1000 and IMS 3000 systems are also supported.
In Stop&Go mode the operator stops the GRP trolley at each measuring position and triggers a single point measurement that records all track data, while continuous mode records track parameters at about 10 Hz as the trolley moves. Continuous mode is meant for cases where the highest accuracy is not needed, and single points or markers can still be taken.
Yes. With the GRP 3000, Amberg Rail Survey measures lateral objects such as platforms, overhead wire and neighbour tracks, as well as profiles. The IMS 3000 measures lateral distances and profiles, and the IMS 1000 measures lateral distances. IMS measurements are reflectorless, and an Auto profile function measures a complete cross-section with a defined number of points.
In Amberg Rail Survey, a GNSS measurement during an IMS 1000 or IMS 3000 survey is taken with the trolley standing still for at least 5 seconds, and only when the position quality is OK with ambiguities fixed. Longer measurements improve reliability. Moving the trolley discards the measurement, and the antenna positions are averaged during post-processing.
In Amberg Rail Survey the operator presses Pause, then either retracts the gauge wheel and rolls the trolley on the rail, or lifts the trolley and enters the gap distance. Gaps may not exceed 10 m, with at least 5 m measured on each side. Gauge is interpolated across the gap, and the trajectory too when lifted.
Yes. Amberg Rail Survey can join IMS setups measured without known control points using correlation merge, which matches superelevation and gauge in overlapping sections and aligns the trajectories into one continuous stationing. Setups need about 20 m of overlap, and an optional overlap assistant guides the operator in the field. The result stays in a local coordinate system.
From the track view, Amberg Rail Survey exports tab-separated ASCII, DXF, LandXML, LandXML as design and JSON for Amberg Design Creator, and creates text and graphic reports, including deviation and twist reports. Additionally, Amberg Rail Survey data can be exported to Amberg Track Pro Office software, for track maintenance analysis. Exports can be limited by stationing range and minimal point distance, and the height of the lower rail can be exported instead of the centre line.